Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← wiki/sources
source

Energy Commission backup generating project RB Inyokern Data Center (web)

Online ↗

Type
source
Created
2026-11-22
Updated
2026-11-22
Sources
1
Tags
A, data-centers, energy, backup-generation, california, permitting, kern-county, sce
Elements
A
Origin
web
Tier
primary
Citable
yes
Url
https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center
Rehost
yes

Links to 13, referenced by 15

Energy Commission backup generating project RB Inyokern Data Center (web)

Citation

California Energy Commission (CEC). “RB Inyokern Data Center.” Project page of the Power Plant Listing, technology “Backup Generating System”. Web page, no date. https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center. Fetched 2026-11-22; read 2026-11-22. Copy: raw/web/2026-11-22 Energy Commission backup generating project RB Inyokern Data Center.md (original: raw/web/2026-11-22 Energy Commission backup generating project RB Inyokern Data Center.html).

Bottom line

  • The CEC project page for a data center in Inyokern, Kern County, with up to 99 megawatts (MW) of backup generation. Its status is “Under Review”.
  • The data center building is about 238,000 square feet. Southern California Edison (SCE) serves it, and its 40 diesel generators take no part in grid-support operations.

Background

The CEC is a California state agency. This page is one of the 12 project pages that the Energy Commission power plant listing backup generating systems (web) links. R&L Capital, Inc. is the project owner. The docket number is 26-SPPE-01, the capacity is 99 MW and the location is Inyokern, Kern County, California. The project status is “Under Review” and the project type is “Small Power Plant Exemption”.

Key claims

  • “The RB Inyokern Data Center (RBIDC) would include a total of forty (40) diesel-fired generator sets that would be used exclusively to provide up to 99 megawatts (MW) of backup emergency generation to support on-site, data center operations during utility outages.” (Project Description)
  • “Of the 40 generators, approximately 70 percent would be dedicated to replacing the critical IT load of the data center, while the remaining capacity would be used to support general facility loads, building systems, and life-safety services during emergency outages.” (Project Description)
  • “The RBIDC emergency backup generating facility would not be electrically interconnected to the transmission or distribution grid, and would not participate in demand response, peak shaving, or any grid-support operations.” (Project Description)
  • “The single-story data center building will be approximately 238,000 square feet, with a maximum structural height of 30 feet.” (Project Description)
  • “On-site fuel storage would be sized to sustain 72 hours of continuous operation at full design load, consistent with Tier III data center reliability criteria.” (Project Description)
  • “The CEC does not permit data centers but does have jurisdiction over certain energy infrastructure associated with them under its exclusive permitting authority to certify all thermal generating facilities 50 megawatts (MW) and larger in California.” (Data Centers)

Evidence and method

A project page from a state agency’s website. It gives the docket’s fields, a project description and, for some projects, key dates with links to docket documents. This library does not hold the docket documents.

Limits

  • The page gives no key dates.
  • It gives the share of generators for the IT load, but not the data center’s normal electrical demand.
  • The project description is the applicant’s proposal, in the conditional. The page can change after the fetch date.

Suggest a change to this page

Source file: wiki/sources/Energy Commission backup generating project RB Inyokern Data Center (web).md, updated 2026-11-22.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.