Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← wiki/sources
source

Energy Commission backup generating project Lafayette (web)

Online ↗

Type
source
Created
2026-11-22
Updated
2026-11-22
Sources
1
Tags
A, data-centers, energy, backup-generation, california, permitting, silicon-valley-power
Elements
A
Origin
web
Tier
primary
Citable
yes
Url
https://www.energy.ca.gov/powerplant/backup-generating-system/lafayette-backup-generating-facility
Rehost
yes

Links to 13, referenced by 16

Energy Commission backup generating project Lafayette (web)

Citation

California Energy Commission (CEC). “Lafayette Backup Generating Facility.” Project page of the Power Plant Listing, technology “Backup Generating System”. Web page, no date. https://www.energy.ca.gov/powerplant/backup-generating-system/lafayette-backup-generating-facility. Fetched 2026-11-22; read 2026-11-22. Copy: raw/web/2026-11-22 Energy Commission backup generating project Lafayette.md (original: raw/web/2026-11-22 Energy Commission backup generating project Lafayette.html).

Bottom line

  • The CEC project page for a backup generating facility of up to 99.8 megawatts (MW) for the Lafayette Data Center. Its status is “Exempted”.
  • The data center is designed for 66 MW of power to information technology (IT) equipment. Silicon Valley Power supplies its normal power, and 44 diesel generators give backup.

Background

The CEC is a California state agency. This page is one of the 12 project pages that the Energy Commission power plant listing backup generating systems (web) links. The docket number is 20-SPPE-02 and the capacity is 99.8 MW. The page names no project owner and has no location field. The project status is “Exempted” and the project type is “Small Power Plant Exemption”.

Key claims

  • “The Lafayette Data Center project (LDC) would include demolition of existing improvements on a 13.04-acre site to construct a three-story 576,120 square foot data center building, utility substation, generator equipment yard, surface parking, and landscaping.” (Project Description)
  • “The data center building will house computer servers for private clients in a secure and environmentally controlled structure and would be designed to provide 66 megawatts (MW) of power to information technology (Critical IT) equipment.” (Project Description)
  • “Power to run the LDC would be provided by Silicon Valley Power.” (Project Description)
  • “The LBGF would consist of 44 diesel-fired backup generators arranged in a generation yard located on the south side of the LDC.” (Project Description)
  • “Order Certifying the Final Environmental Impact Report and Granting the Small Powerplant Exemption” (Key Dates, 11/9/2023)
  • “The CEC Small Power Plant Exemption (SPPE) process allows applicants proposing thermal power plants between 50 and 100 MW to obtain an exemption from the CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification.” (Small Power Plant Exemption)

Evidence and method

A project page from a state agency’s website. It gives the docket’s fields, a project description and, for some projects, key dates with links to docket documents. This library does not hold the docket documents.

Limits

  • The page gives no city, address or project owner.
  • The key dates run from the filing on May 20, 2020 to the Notice of Determination on Nov. 13, 2023. The page says nothing about construction.
  • The project description is the applicant’s proposal, in the conditional. The page can change after the fetch date.

Suggest a change to this page

Source file: wiki/sources/Energy Commission backup generating project Lafayette (web).md, updated 2026-11-22.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.