Energy Commission backup generating project Silver Creek (web)

Online ↗

Type
source
Created
2026-11-22
Updated
2026-11-22
Sources
1
Tags
A, data-centers, energy, backup-generation, california, permitting, san-jose, pge
Elements
A
Origin
web
Tier
primary
Citable
yes
Url
https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf
Rehost
yes

Links to 13, referenced by 15

Energy Commission backup generating project Silver Creek (web)

Citation

California Energy Commission (CEC). “Silver Creek Backup Generating Facility (SCBGF).” Project page of the Power Plant Listing, technology “Backup Generating System”. Web page, no date. https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf. Fetched 2026-11-22; read 2026-11-22. Copy: raw/web/2026-11-22 Energy Commission backup generating project Silver Creek.md (original: raw/web/2026-11-22 Energy Commission backup generating project Silver Creek.html).

Bottom line

  • The CEC project page for a backup generating facility of up to 99 megawatts (MW) for a proposed data center in San Jose. Its status is “Under Review”.
  • The facility has 44 diesel generators. PG&E is to build a new Hellyer Switching Station about 1,400 feet from the site to serve the data center.

Background

The CEC is a California state agency. This page is one of the 12 project pages that the Energy Commission power plant listing backup generating systems (web) links. Prologis, L.P. is the project owner. The docket number is 26-SPPE-02 and the location is San Jose, California. The page has no capacity field; its project description gives the capacity. The project status is “Under Review” and the project type is “Small Power Plant Exemption”.

Key claims

  • “The Silver Creek Backup Generating Facility (SCBGF) would consist of forty-four (44) diesel-fired generators to be used to provide up to 99 megawatts (MW) of backup electricity generation to support the proposed Silver Creek Data Center (SCDC).” (Project Description)
  • “The proposed SCDC, SCBGF, and project substation would be located on a 15.13-acre site, at 5977 Silver Creek Valley Road, in San Jose, California.” (Project Description)
  • “The SCBGF would only be connected to the SCDC and would not be interconnected to the electrical transmission or distribution grid.” (Project Description)
  • “The switching station would be constructed, owned, and operated by PG&E.” (Project Description)
  • “The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification.” (Small Power Plant Exemption)

Evidence and method

A project page from a state agency’s website. It gives the docket’s fields, a project description and, for some projects, key dates with links to docket documents. This library does not hold the docket documents.

Limits

  • The page gives no key dates and no size of the data center building.
  • The same owner has the Charcot Avenue project, and the two descriptions have almost the same text.
  • The project description is the applicant’s proposal, in the conditional. The page can change after the fetch date.

Suggest a change to this page

Source file: wiki/sources/Energy Commission backup generating project Silver Creek (web).md, updated 2026-11-22.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.