Energy Commission backup generating project Silver Creek (web)
Citation
California Energy Commission (CEC). “Silver Creek Backup Generating Facility (SCBGF).” Project page of the Power Plant Listing, technology “Backup Generating System”. Web page, no date. https://www.energy.ca.gov/powerplant/backup-generating-system/silver-creek-backup-generating-facility-scbgf. Fetched 2026-11-22; read 2026-11-22. Copy: raw/web/2026-11-22 Energy Commission backup generating project Silver Creek.md (original: raw/web/2026-11-22 Energy Commission backup generating project Silver Creek.html).
Bottom line
- The CEC project page for a backup generating facility of up to 99 megawatts (MW) for a proposed data center in San Jose. Its status is “Under Review”.
- The facility has 44 diesel generators. PG&E is to build a new Hellyer Switching Station about 1,400 feet from the site to serve the data center.
Background
The CEC is a California state agency. This page is one of the 12 project pages that the Energy Commission power plant listing backup generating systems (web) links. Prologis, L.P. is the project owner. The docket number is 26-SPPE-02 and the location is San Jose, California. The page has no capacity field; its project description gives the capacity. The project status is “Under Review” and the project type is “Small Power Plant Exemption”.
Key claims
- “The Silver Creek Backup Generating Facility (SCBGF) would consist of forty-four (44) diesel-fired generators to be used to provide up to 99 megawatts (MW) of backup electricity generation to support the proposed Silver Creek Data Center (SCDC).” (Project Description)
- “The proposed SCDC, SCBGF, and project substation would be located on a 15.13-acre site, at 5977 Silver Creek Valley Road, in San Jose, California.” (Project Description)
- “The SCBGF would only be connected to the SCDC and would not be interconnected to the electrical transmission or distribution grid.” (Project Description)
- “The switching station would be constructed, owned, and operated by PG&E.” (Project Description)
- “The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification.” (Small Power Plant Exemption)
Evidence and method
A project page from a state agency’s website. It gives the docket’s fields, a project description and, for some projects, key dates with links to docket documents. This library does not hold the docket documents.
Limits
- The page gives no key dates and no size of the data center building.
- The same owner has the Charcot Avenue project, and the two descriptions have almost the same text.
- The project description is the applicant’s proposal, in the conditional. The page can change after the fetch date.
Related
- Energy Commission power plant listing backup generating systems (web): the list of the 12 backup generating facilities.
- The other 11 project pages:
- Energy Commission backup generating project AVAIO Pittsburg (web)
- Energy Commission backup generating project Bowers (web)
- Energy Commission backup generating project Charcot Avenue (web)
- Energy Commission backup generating project Lafayette (web)
- Energy Commission backup generating project Martin (web)
- Energy Commission backup generating project NorthTown (web)
- Energy Commission backup generating project RB Inyokern Data Center (web)
- Energy Commission backup generating project STACK SVY03A Data Center Campus (web)
- Energy Commission backup generating project San Jose Data Center 04 (web)
- Energy Commission backup generating project San Jose Data Center (web)
- Energy Commission backup generating project Vernon (web)