Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← raw/web
original document

RB Inyokern Data Center

Original ↗ Online ↗

Url
https://www.energy.ca.gov/powerplant/backup-generating-system/rb-inyokern-data-center
Fetched
2026-11-22
Publisher
California Energy Commission
Published
unknown
Original
2026-11-22 Energy Commission backup generating project RB Inyokern Data Center.html
Rehost
yes

Links to 0, referenced by 1

Markdown copy of 2026-11-22 Energy Commission backup generating project RB Inyokern Data Center.html, made 2026-11-22. The original is the authority. Skip to main content

  • CA.gov
  • Share via Facebook Share via Twitter Share via LinkedIn Share via Email
  • About
  • Careers
  • Contact
  • Events
  • Newsroom
  • Resources
  • Translate
  • Settings

Translate this website to your preferred language:

Powered by

Google TranslateTranslate

Default High Contrast

Reset

Increase Font Size

Increase Font Size

Decrease Font Size

Decrease Font Size

Dyslexic Font

[image on the original web page: California Energy Commission] California Energy Commission

Search this site

Search this site:

Search

View AllClose

  • Home

  • Proceedings

    Sub Menu Toggle

    • Proceedings
    • Active Proceedings
    • Business Meetings
    • Dockets
    • E-Filing and E-Commenting
    • Opportunities for Public Participation
    • Power Plant Listing
  • Rules and Regulations

    Sub Menu Toggle

    • Rules and Regulations
    • Appliance Efficiency Regulations
    • Building Energy Efficiency
    • Clean Transportation Regulations
    • Energy Suppliers Reporting
    • State Energy Management
  • Programs and Topics

    Sub Menu Toggle

    • Programs and Topics
    • All Programs
    • All Topics
  • Funding

    Sub Menu Toggle

    • Funding
    • Solicitations
    • Awards
    • Funding Resources
    • Funding Workshops
    • Grants Ombudsman
  • Data and Reports

    Sub Menu Toggle

    • Data and Reports
    • All Publications
    • California Energy Planning Library
    • California Power Generation and Power Sources
    • Clean Energy Serving California
    • Data Exploration Tools
    • Energy Almanac
    • Energy Maps and Spatial Data
    • Reports
    • Surveys
  1. Home
  2. Programs and Topics
  3. All Topics
  4. Power Plants
  5. RB Inyokern Data Center

RB Inyokern Data Center

Project Owner : R&L Capital, Inc.

Docket Number : 26-SPPE-01

Capacity : 99 MW

Location : Inyokern, Kern County, California

Technology : Backup Generating System

Project Status : Under Review

Project Type : Small Power Plant Exemption

Project Description

The RB Inyokern Data Center (RBIDC) would include a total of forty (40) diesel-fired generator sets that would be used exclusively to provide up to 99 megawatts (MW) of backup emergency generation to support on-site, data center operations during utility outages. Each generator would have a generating capacity of 3 MW. Of the 40 generators, approximately 70 percent would be dedicated to replacing the critical IT load of the data center, while the remaining capacity would be used to support general facility loads, building systems, and life-safety services during emergency outages. The RBIDC emergency backup generating facility would not be electrically interconnected to the transmission or distribution grid, and would not participate in demand response, peak shaving, or any grid-support operations.

The proposed project site is located near the intersection of U.S. Highway 395 and State Route 178 in Inyokern, an unincorporated area of Kern County, California. The data center building, emergency backup generating facility, on-site substation, fuel storage, cooling systems, site circulation, and parking would be located on Kern County APNs 084-010-43, 084-010-44, a portion of 084-010-45, and a portion of 084-010-48. The total project site encompasses approximately 50 acres of industrially zoned land. The single-story data center building will be approximately 238,000 square feet, with a maximum structural height of 30 feet.

The forty generators would be arranged in two secured generator yards of twenty (20) units each, positioned on opposite sides of the main data center building to ensure load distribution and operational redundancy. All generators would be equipped with Tier 4 Final emissions controls, including selective catalytic reduction (SCR), diesel oxidation catalyst, and diesel particulate filters (DPF). The facility would include a new customer-dedicated 115/34.5 kilovolt (kV) substation served by two independent 115 kV feeders from Southern California Edison (SCE) and supported by two 60/80/100 MVA transformers configured for redundancy, connecting to SCE’s existing infrastructure via underground gen-tie facilities at SCE’s Inyokern Substation. On-site fuel storage would be sized to sustain 72 hours of continuous operation at full design load, consistent with Tier III data center reliability criteria.

Data Centers

The CEC does not permit data centers but does have jurisdiction over certain energy infrastructure associated with them under its exclusive permitting authority to certify all thermal generating facilities 50 megawatts (MW) and larger in California.

Small Power Plant Exemption

The CEC has the exclusive authority to certify all thermal power plants 50 megawatts (MW) and larger and related facilities proposed for construction in California. The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. CEC can grant an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. Public Resources Code section 25519(c) designates CEC as the “lead agency”, in accordance with the California Environmental Quality Act (CEQA), for all facilities seeking an SPPE. In granting an SPPE, the CEC is not the final approval necessary for construction and operation of a project. Instead, if the CEC grants an SPPE, the responsible local land use authorities and other agencies, such as the local air management district, will assume jurisdiction over the project under their respective permitting processes, and conduct any other necessary environmental review as “responsible agencies” under CEQA.

Original Proceeding

Submit e-Comment

Submit e-Filing

Docket Log (26-SPPE-01)

Exhibit List

Proof of Service List

Search All Power Plant Documents

Contacts

Project Manager

Elizabeth Huber STEPsiting@energy.ca.gov (Please enter project name in the email subject line)

+1 916-776-0609

Public Participation Questions

Public Advisor publicadvisor@energy.ca.gov 916-269-9595

Media Inquiries

Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989

Subscribe RB Inyokern Data Center

Automated Email Notifications

Email

Please enter your email address.

Leave this field blank

Contact

California Energy Commission 715 P Street Sacramento, CA 95814

Contact Us | Directions Language Services

Careers

Come be part of creating a clean, modern and thriving California.

Learn more about Careers

Campaigns

Copyright © 2026 State of California

Suggest a change to this page

Source file: raw/web/2026-11-22 Energy Commission backup generating project RB Inyokern Data Center.md.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.