NERSC Doudna announcement 2025-05-29 (web)
Citation
Ball, Elizabeth. “DOE Announces New Supercomputer Powered by Dell and NVIDIA to Speed Scientific Discovery.” National Energy Research Scientific Computing Center (NERSC), Center News, May 29, 2025. https://www.nersc.gov/news-and-events/news/doe-announces-new-supercomputer-powered-by-dell-and-nvidia-to-speed-scientific-discovery. Copy: raw/web/2026-11-11 NERSC Doudna announcement 2025-05-29.md (original: .html beside it). Read 2026-11-11.
Bottom line
- The Secretary of Energy announced a contract with Dell Technologies for NERSC-10, the next NERSC flagship supercomputer. It is due in 2026. Its name is Doudna.
- Doudna uses NVIDIA’s Vera Rubin platform and Dell liquid-cooled servers. It “will provide more than ten times the performance of Perlmutter”.
Background
NERSC is a U.S. Department of Energy (DOE) user facility at Lawrence Berkeley National Laboratory (Berkeley Lab). The Secretary made the announcement during a visit to Berkeley Lab. The news item quotes the Secretary, Dell, NVIDIA and the NERSC Director. “Berkeley Lab is a multiprogram national laboratory managed by the University of California for the U.S. Department of Energy’s Office of Science.”
Key claims
- “Secretary of Energy Chris Wright today announced a new contract with Dell Technologies to develop NERSC-10, the next flagship supercomputer at the National Energy Research Scientific Computing Center (NERSC)”. (lead paragraph)
- “The new system, due in 2026, will be named in honor of Jennifer Doudna”. (lead paragraph)
- “The Doudna supercomputer will provide more than ten times the performance of Perlmutter, NERSC’s current flagship supercomputer.” (system description)
- “Doudna will be built using cutting-edge technology such as Dell’s most advanced ORv3 direct liquid-cooled server technology and the NVIDIA Vera-Rubin CPU-GPU platform.” (system description)
- “We are collaborating with NVIDIA and Dell to prepare our 11,000 users to effectively use this system’s exciting new workflow capabilities”. (quote of the NERSC Director)
- “Doudna will be connected to DOE experimental and observational facilities through the Energy Sciences Network (ESnet)”. (quote of the NERSC Director)
- “the system’s powerful GPUs will enable DOE-funded researchers to seamlessly integrate large-scale AI into their simulation and data analysis workflows”. (system description)
- NERSC supports “more than 11,000 scientists and 800 projects annually.” (boilerplate)
Evidence and method
A news item from the facility. It describes a contract and the planned system. It quotes officials and the vendors. It gives no contract value, no node count and no peak performance figure.
Limits
The item does not give the cost of the contract or the system. It gives performance only as a multiple of Perlmutter. It does not give a delivery month. It describes a planned system in May 2025, not one in operation.