Markdown copy of 2026-11-22 Energy Commission backup generating project San Jose Data Center 04.html, made 2026-11-22. The original is the authority. Skip to main content
- CA.gov
- Share via Facebook Share via Twitter Share via LinkedIn Share via Email
- About
- Careers
- Contact
- Events
- Newsroom
- Resources
- Translate
- Settings
Translate this website to your preferred language:
Powered by
Default High Contrast
Reset
Increase Font Size
Increase Font Size
Decrease Font Size
Decrease Font Size
Dyslexic Font
[image on the original web page: California Energy Commission] California Energy Commission
Search this site
Search this site:
Search
View AllClose
-
Home
-
Proceedings
Sub Menu Toggle
- Proceedings
- Active Proceedings
- Business Meetings
- Dockets
- E-Filing and E-Commenting
- Opportunities for Public Participation
- Power Plant Listing
-
Rules and Regulations
Sub Menu Toggle
- Rules and Regulations
- Appliance Efficiency Regulations
- Building Energy Efficiency
- Clean Transportation Regulations
- Energy Suppliers Reporting
- State Energy Management
-
Programs and Topics
Sub Menu Toggle
- Programs and Topics
- All Programs
- All Topics
-
Funding
Sub Menu Toggle
- Funding
- Solicitations
- Awards
- Funding Resources
- Funding Workshops
- Grants Ombudsman
-
Data and Reports
Sub Menu Toggle
- Data and Reports
- All Publications
- California Energy Planning Library
- California Power Generation and Power Sources
- Clean Energy Serving California
- Data Exploration Tools
- Energy Almanac
- Energy Maps and Spatial Data
- Reports
- Surveys
- Home
- Programs and Topics
- All Topics
- Power Plants
- San José Data Center 04
San José Data Center 04
This proceeding is for the potential exemption of a data center project in the City of San José , California.
Project Owner : Microsoft Corporation
Docket Number : 22-SPPE-02
Capacity : 97.8 MW
Location : San José, California
Technology : Backup Generating System
Project Status : Under Review
Project Type : Small Power Plant Exemption
Project Description
Microsoft Corporation (Microsoft) proposes to build the San José Data Center campus (the project or SJDC 04) to be located at the northwest corner of the intersection of Orchard Parkway and Component Drive in San José, California (project site). The project would be located on two parcels of land, assessor parcel numbers 101-02-019 and 101-02-020. The two parcels would be merged through a lot adjustment/merger. The project would include two four-story data center buildings, each approximately 315,639 gross square feet; emergency backup generating facilities; recycled water storage, fire water storage, pipelines, and support buildings; building cooling equipment; an on-site substation and switching station; two potential distribution transmission lines; and ancillary support facilities. The project also includes the installation of off-site utility infrastructure and may include offsite intersection improvements within existing public right-of-way (off-site improvement areas). Off-site utilities include potable water, recycled water, fire water, stormwater and sanitary sewer pipelines.
The total maximum electrical demand of the project would be 97.8 megawatts (MW). The Tier 4 diesel backup generating facilities with selective catalytic reduction and diesel particulate filters would consist of thirty-two 3 MW primary emergency generators, two 0.5 MW administrative emergency generators, and two 0.8 MW storage tank area emergency generators. The sole purpose of the backup generating facilities is to provide electrical power to support the data center campus operations in the event of loss of electrical service from the local electric utility provider, Pacific Gas and Electric Company.
Small Power Plant Exemption
The CEC has the exclusive authority to certify all thermal power plants 50 megawatts (MW) and larger and related facilities proposed for construction in California. The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. CEC can grant an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. Public Resources Code section 25519(c) designates CEC as the “lead agency”, in accordance with the California Environmental Quality Act (CEQA), for all facilities seeking an SPPE. In granting an SPPE, the CEC is not the final approval necessary for construction and operation of a project. Instead, if the CEC grants an SPPE, the responsible local land use authorities and other agencies, such as the local air management district, will assume jurisdiction over the project under their respective permitting processes, and conduct any other necessary environmental review as “responsible agencies” under CEQA.
Original Proceeding
Search All Power Plant Documents
Contacts
Project Manager
John Heiser STEPsiting@energy.ca.gov (Please enter project name in the email subject line)
916-628-5566
Public Participation Questions
Public Advisor publicadvisor@energy.ca.gov 916-269-9595
Media Inquiries
Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989
Related Links
- Project Figures
Subscribe San José Data Center 04
Automated Email Notifications
Please enter your email address.
Leave this field blank
Contact
California Energy Commission 715 P Street Sacramento, CA 95814
Contact Us | Directions Language Services
Careers
Come be part of creating a clean, modern and thriving California.
Learn more about Careers
Campaigns
-
Accessibility
-
Conditions of Use
-
Privacy Policy
-
Sitemap
-
Accessibility Certificate
Copyright © 2026 State of California