Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← raw/web
original document

STACK SVY03A Data Center Campus

Original ↗ Online ↗

Url
https://www.energy.ca.gov/powerplant/backup-generating-system/stack-svy03a-data-center-campus
Fetched
2026-11-22
Publisher
California Energy Commission
Published
unknown
Original
2026-11-22 Energy Commission backup generating project STACK SVY03A Data Center Campus.html
Rehost
yes

Links to 0, referenced by 1

Markdown copy of 2026-11-22 Energy Commission backup generating project STACK SVY03A Data Center Campus.html, made 2026-11-22. The original is the authority. Skip to main content

  • CA.gov
  • Share via Facebook Share via Twitter Share via LinkedIn Share via Email
  • About
  • Careers
  • Contact
  • Events
  • Newsroom
  • Resources
  • Translate
  • Settings

Translate this website to your preferred language:

Powered by

Google TranslateTranslate

Default High Contrast

Reset

Increase Font Size

Increase Font Size

Decrease Font Size

Decrease Font Size

Dyslexic Font

[image on the original web page: California Energy Commission] California Energy Commission

Search this site

Search this site:

Search

View AllClose

  • Home

  • Proceedings

    Sub Menu Toggle

    • Proceedings
    • Active Proceedings
    • Business Meetings
    • Dockets
    • E-Filing and E-Commenting
    • Opportunities for Public Participation
    • Power Plant Listing
  • Rules and Regulations

    Sub Menu Toggle

    • Rules and Regulations
    • Appliance Efficiency Regulations
    • Building Energy Efficiency
    • Clean Transportation Regulations
    • Energy Suppliers Reporting
    • State Energy Management
  • Programs and Topics

    Sub Menu Toggle

    • Programs and Topics
    • All Programs
    • All Topics
  • Funding

    Sub Menu Toggle

    • Funding
    • Solicitations
    • Awards
    • Funding Resources
    • Funding Workshops
    • Grants Ombudsman
  • Data and Reports

    Sub Menu Toggle

    • Data and Reports
    • All Publications
    • California Energy Planning Library
    • California Power Generation and Power Sources
    • Clean Energy Serving California
    • Data Exploration Tools
    • Energy Almanac
    • Energy Maps and Spatial Data
    • Reports
    • Surveys
  1. Home
  2. Programs and Topics
  3. All Topics
  4. Power Plants
  5. STACK SVY03A Data Center Campus

STACK SVY03A Data Center Campus

Project Owner : STACK Infrastructure

Docket Number : 23-SPPE-01

Capacity : Up to 76.6 megawatts

Location : Hayward

Technology : Backup Generating System

Project Status : Exempted

Project Type : Small Power Plant Exemption

Project Description

STACK Infrastructure is proposing to develop the SVY03A Data Center Campus (campus), which would be located in the City of Hayward at 26203 Production Avenue.  The proposed campus would include a three-story data center building, a one-story data center building, backup generators to support both data centers, a security building, an on-site project substation, and a Pacific Gas and Electric Company switching station. The campus would also include new site and infrastructure improvements consisting of new access driveways located at Eden Landing Road and Production Avenue, internal circulation improvements, parking, a loading dock, stormwater basins, landscaping, utilities, water tank, and a perimeter security fence. The backup generators would have a total generation capacity of up to 76.6 megawatts (MW). A total of 28 emergency generators would be arranged in two generation yards, with 26 2.75 MW generators and a single 1 MW generator serving the larger data center building, and a single 1.6 MW generator serving the smaller data center building. The generators would be dedicated to replace the maximum electricity needs of the campus in case of a loss of utility power and would only serve the campus and its components. Included in the total number of generators are redundant generators to ensure the maximum electricity needs (76.6 MW) of the campus would be maintained in a disruption of utility power.

Small Power Plant Exemption

The CEC Small Power Plant Exemption (SPPE) process allows applicants proposing thermal power plants between 50 and 100 MW to obtain an exemption from the CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. The CEC can grant an exemption if it finds that the proposed facility will not create a substantial adverse impact on the environment or energy resources. These facilities were exempted from the CEC’s jurisdiction.

Original Proceeding

Submit e-Comment

Submit e-Filing

Docket Log (23-SPPE-01)

Exhibit List

Proof of Service List

Search All Power Plant Documents

Contacts

Project Manager

Renee Longman STEPsiting@energy.ca.gov (Please enter project name in the email subject line)

916-937-3538

Public Participation Questions

Public Advisor publicadvisor@energy.ca.gov 916-269-9595

Media Inquiries

Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989

Subscribe STACK SVY03A Data Center Campus

Automated Email Notifications

Email

Please enter your email address.

Leave this field blank

Contact

California Energy Commission 715 P Street Sacramento, CA 95814

Contact Us | Directions Language Services

Careers

Come be part of creating a clean, modern and thriving California.

Learn more about Careers

Campaigns

Copyright © 2026 State of California

Suggest a change to this page

Source file: raw/web/2026-11-22 Energy Commission backup generating project STACK SVY03A Data Center Campus.md.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.