Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← raw/web
original document

NorthTown Backup Generating Facility

Original ↗ Online ↗

Url
https://www.energy.ca.gov/powerplant/backup-generating-system/northtown-backup-generating-facility
Fetched
2026-11-22
Publisher
California Energy Commission
Published
unknown
Original
2026-11-22 Energy Commission backup generating project NorthTown.html
Rehost
yes

Links to 0, referenced by 1

Markdown copy of 2026-11-22 Energy Commission backup generating project NorthTown.html, made 2026-11-22. The original is the authority. Skip to main content

  • CA.gov
  • Share via Facebook Share via Twitter Share via LinkedIn Share via Email
  • About
  • Careers
  • Contact
  • Events
  • Newsroom
  • Resources
  • Translate
  • Settings

Translate this website to your preferred language:

Powered by

Google TranslateTranslate

Default High Contrast

Reset

Increase Font Size

Increase Font Size

Decrease Font Size

Decrease Font Size

Dyslexic Font

[image on the original web page: California Energy Commission] California Energy Commission

Search this site

Search this site:

Search

View AllClose

  • Home

  • Proceedings

    Sub Menu Toggle

    • Proceedings
    • Active Proceedings
    • Business Meetings
    • Dockets
    • E-Filing and E-Commenting
    • Opportunities for Public Participation
    • Power Plant Listing
  • Rules and Regulations

    Sub Menu Toggle

    • Rules and Regulations
    • Appliance Efficiency Regulations
    • Building Energy Efficiency
    • Clean Transportation Regulations
    • Energy Suppliers Reporting
    • State Energy Management
  • Programs and Topics

    Sub Menu Toggle

    • Programs and Topics
    • All Programs
    • All Topics
  • Funding

    Sub Menu Toggle

    • Funding
    • Solicitations
    • Awards
    • Funding Resources
    • Funding Workshops
    • Grants Ombudsman
  • Data and Reports

    Sub Menu Toggle

    • Data and Reports
    • All Publications
    • California Energy Planning Library
    • California Power Generation and Power Sources
    • Clean Energy Serving California
    • Data Exploration Tools
    • Energy Almanac
    • Energy Maps and Spatial Data
    • Reports
    • Surveys
  1. Home
  2. Programs and Topics
  3. All Topics
  4. Power Plants
  5. NorthTown Backup Generating Facility

NorthTown Backup Generating Facility

Project Owner : GIC San Jose, LLC

Docket Number : 25-SPPE-02

Capacity : 97.3 MW

Location : San José, California

Technology : Backup Generating System

Project Status : Under Review

Project Type : Small Power Plant Exemption

Project Description

The NorthTown Backup Generating Facility (NTBGF) would consist of a total of forty two (42) diesel- fired generators that would be used exclusively to provide up to 97.3 megawatts (MW) of backup emergency generation to support NorthTown Data Center (NTDC) to provide uninterrupted power for its tenant’s servers.

The proposed project site is at the southwest corner of the intersection of West Trimble Road and Orchard Parkway in San José, California. The data center buildings, emergency backup generating facilities, project substation, water storage and treatment area, the PG&E Switching Station, site circulation, and parking would be located on APNs 101-02-018 and 101-02-021. The entire project site is approximately 28.5 acres.

The NTBGF would only provide interconnection to the NTDC and would not be interconnected to the transmission or distribution grid. The project would construct a new 115-34.5 kilovolt (kV), 110 mega volt-ampere (MVA) electrical substation (project substation) adjacent to the proposed expansion of the recently permitted PG&E utility. The two-bay project substation (two 105 MVA 115kV - 34.5 kV step-down transformers and primary distribution switchgear) would be designed to allow one of the two transformers to be taken out of service, effectively providing 105 MVA of total power (a 2-to-make-1 design).

Of the 42 total generators, two of the generators would each have a generating capacity of up to 1.75 MW and the remaining 40 generators would each have a generating capacity of 3 MW. Of those 40 generators rated 3 MW, eight would be redundant. The generators would be arranged in two generation yards located adjacent to each data center building (DC North and DC West). All 40 of the 3-MW generators would be dedicated to replacing the electricity needs of the data center in case of a loss of utility power, while the two 1.75-MW generators would be used to support general office loads along with building and life safety services (i.e., house generators) during emergencies.

Data Centers

The CEC does not permit data centers but does have jurisdiction over certain energy infrastructure associated with them under its exclusive permitting authority to certify all thermal generating facilities 50 megawatts (MW) and larger in California.

Small Power Plant Exemption

The CEC has the exclusive authority to certify all thermal power plants 50 megawatts (MW) and larger and related facilities proposed for construction in California. The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. CEC can grant an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. Public Resources Code section 25519(c) designates CEC as the “lead agency”, in accordance with the California Environmental Quality Act (CEQA), for all facilities seeking an SPPE. In granting an SPPE, the CEC is not the final approval necessary for construction and operation of a project. Instead, if the CEC grants an SPPE, the responsible local land use authorities and other agencies, such as the local air management district, will assume jurisdiction over the project under their respective permitting processes, and conduct any other necessary environmental review as “responsible agencies” under CEQA.

Original Proceeding

Submit e-Comment

Submit e-Filing

Docket Log (25-SPPE-02)

Exhibit List

Proof of Service List

Search All Power Plant Documents

Contacts

Project Manager

Elizabeth Huber STEPsiting@energy.ca.gov (Please enter project name in the email subject line)

916-776-0609

Public Participation Questions

Public Advisor publicadvisor@energy.ca.gov 916-269-9595

Media Inquiries

Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989

Subscribe NorthTown Backup Generating Facility

Automated Email Notifications

Email

Please enter your email address.

Leave this field blank

Contact

California Energy Commission 715 P Street Sacramento, CA 95814

Contact Us | Directions Language Services

Careers

Come be part of creating a clean, modern and thriving California.

Learn more about Careers

Campaigns

Copyright © 2026 State of California

Suggest a change to this page

Source file: raw/web/2026-11-22 Energy Commission backup generating project NorthTown.md.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.