Markdown copy of 2026-11-22 Energy Commission backup generating project AVAIO Pittsburg.html, made 2026-11-22. The original is the authority. Skip to main content
- CA.gov
- Share via Facebook Share via Twitter Share via LinkedIn Share via Email
- About
- Careers
- Contact
- Events
- Newsroom
- Resources
- Translate
- Settings
Translate this website to your preferred language:
Powered by
Default High Contrast
Reset
Increase Font Size
Increase Font Size
Decrease Font Size
Decrease Font Size
Dyslexic Font
[image on the original web page: California Energy Commission] California Energy Commission
Search this site
Search this site:
Search
View AllClose
-
Home
-
Proceedings
Sub Menu Toggle
- Proceedings
- Active Proceedings
- Business Meetings
- Dockets
- E-Filing and E-Commenting
- Opportunities for Public Participation
- Power Plant Listing
-
Rules and Regulations
Sub Menu Toggle
- Rules and Regulations
- Appliance Efficiency Regulations
- Building Energy Efficiency
- Clean Transportation Regulations
- Energy Suppliers Reporting
- State Energy Management
-
Programs and Topics
Sub Menu Toggle
- Programs and Topics
- All Programs
- All Topics
-
Funding
Sub Menu Toggle
- Funding
- Solicitations
- Awards
- Funding Resources
- Funding Workshops
- Grants Ombudsman
-
Data and Reports
Sub Menu Toggle
- Data and Reports
- All Publications
- California Energy Planning Library
- California Power Generation and Power Sources
- Clean Energy Serving California
- Data Exploration Tools
- Energy Almanac
- Energy Maps and Spatial Data
- Reports
- Surveys
- Home
- Programs and Topics
- All Topics
- Power Plants
- AVAIO Pittsburg Backup Generating Facility (PBGF)
AVAIO Pittsburg Backup Generating Facility (PBGF)
Project Owner : AVAIO Digital Partners I, LLC (AVAIO)
Docket Number : 24-SPPE-01
Capacity : 92 MW
Location : Pittsburg, California
Technology : Backup Generating System
Project Status : Exempted
Project Type : Small Power Plant Exemption
Project Description
Pittsburg Data Hub, LLC a wholly owned subsidiary of AVAIO Digital Partners I, LLC (AVAIO), proposes to develop the Pittsburg Backup Generating Facility (PBGF). The PBGF would consist of a total of thirty-seven (37) 3-megawatt (MW) diesel fired generators that would be used exclusively to provide up to 92 MW of backup emergency generation to support the AVAIO Pittsburg Data Hub (PDH). The components of the PDH would include a three-story approximately 347,740 square foot data center building; a project substation; a Pacific Gas and Electric Company switching station and transmission lines; the PBGF; site access and surface parking; landscaping; stormwater controls and features; and water and sewer pipeline interconnections.
The proposed PDH site encompasses approximately 22.31 acres (APNs 095-160-001, 095-160-002, and 095-150-032) and would be located at 2232 Golf Club Road, Pittsburg, California. Thirty-six (36) of the generators would be dedicated to replacing the electricity needs of the data center and one (1) of the generators would be used to support general office loads along with building and life safety services (house generator) in the case of a loss of utility power. The PBGF is designed to operate only when electricity from Pittsburg Power Company is unavailable to the PDH. The PBGF would not be electrically interconnected to the electrical transmission grid. Rather, it would consist of one generation yard electrically interconnected solely to the PDH.
Expand All Collapse All
- 10/14/2025 - Initial Study/Mitigated Negative Declaration
- 11/21/2025 - Final Initial Study/Mitigated Negative Declaration
Small Power Plant Exemption
The CEC Small Power Plant Exemption (SPPE) process allows applicants proposing thermal power plants between 50 and 100 MW to obtain an exemption from the CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. The CEC can grant an exemption if it finds that the proposed facility will not create a substantial adverse impact on the environment or energy resources. These facilities were exempted from the CEC’s jurisdiction.
Original Proceeding
Search All Power Plant Documents
Contacts
Project Manager
Ali Jahani STEPsiting@energy.ca.gov (Please enter project name in the email subject line)
(279) 226-1175
Public Participation Questions
Public Advisor publicadvisor@energy.ca.gov 916-269-9595
Media Inquiries
Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989
Subscribe AVAIO Pittsburg Backup Generating Facility (PBGF)
Please enter your email address.
Leave this field blank
Contact
California Energy Commission 715 P Street Sacramento, CA 95814
Contact Us | Directions Language Services
Careers
Come be part of creating a clean, modern and thriving California.
Learn more about Careers
Campaigns
-
Accessibility
-
Conditions of Use
-
Privacy Policy
-
Sitemap
-
Accessibility Certificate
Copyright © 2026 State of California