Skip to content
Search Take the survey

↑ ↓ choose a page. Enter searches everything, with exact title matches first; kind:source and other filters work there. Esc closes.

← raw/web
original document

AVAIO Pittsburg Backup Generating Facility (PBGF)

Original ↗ Online ↗

Url
https://www.energy.ca.gov/powerplant/backup-generating-system/avaio-pittsburg-backup-generating-facility-pbgf
Fetched
2026-11-22
Publisher
California Energy Commission
Published
unknown
Original
2026-11-22 Energy Commission backup generating project AVAIO Pittsburg.html
Rehost
yes

Links to 0, referenced by 1

Markdown copy of 2026-11-22 Energy Commission backup generating project AVAIO Pittsburg.html, made 2026-11-22. The original is the authority. Skip to main content

  • CA.gov
  • Share via Facebook Share via Twitter Share via LinkedIn Share via Email
  • About
  • Careers
  • Contact
  • Events
  • Newsroom
  • Resources
  • Translate
  • Settings

Translate this website to your preferred language:

Powered by

Google TranslateTranslate

Default High Contrast

Reset

Increase Font Size

Increase Font Size

Decrease Font Size

Decrease Font Size

Dyslexic Font

[image on the original web page: California Energy Commission] California Energy Commission

Search this site

Search this site:

Search

View AllClose

  • Home

  • Proceedings

    Sub Menu Toggle

    • Proceedings
    • Active Proceedings
    • Business Meetings
    • Dockets
    • E-Filing and E-Commenting
    • Opportunities for Public Participation
    • Power Plant Listing
  • Rules and Regulations

    Sub Menu Toggle

    • Rules and Regulations
    • Appliance Efficiency Regulations
    • Building Energy Efficiency
    • Clean Transportation Regulations
    • Energy Suppliers Reporting
    • State Energy Management
  • Programs and Topics

    Sub Menu Toggle

    • Programs and Topics
    • All Programs
    • All Topics
  • Funding

    Sub Menu Toggle

    • Funding
    • Solicitations
    • Awards
    • Funding Resources
    • Funding Workshops
    • Grants Ombudsman
  • Data and Reports

    Sub Menu Toggle

    • Data and Reports
    • All Publications
    • California Energy Planning Library
    • California Power Generation and Power Sources
    • Clean Energy Serving California
    • Data Exploration Tools
    • Energy Almanac
    • Energy Maps and Spatial Data
    • Reports
    • Surveys
  1. Home
  2. Programs and Topics
  3. All Topics
  4. Power Plants
  5. AVAIO Pittsburg Backup Generating Facility (PBGF)

AVAIO Pittsburg Backup Generating Facility (PBGF)

Project Owner : AVAIO Digital Partners I, LLC (AVAIO)

Docket Number : 24-SPPE-01

Capacity : 92 MW

Location : Pittsburg, California

Technology : Backup Generating System

Project Status : Exempted

Project Type : Small Power Plant Exemption

Project Description

Pittsburg Data Hub, LLC a wholly owned subsidiary of AVAIO Digital Partners I, LLC (AVAIO), proposes to develop the Pittsburg Backup Generating Facility (PBGF). The PBGF would consist of a total of thirty-seven (37) 3-megawatt (MW) diesel fired generators that would be used exclusively to provide up to 92 MW of backup emergency generation to support the AVAIO Pittsburg Data Hub (PDH). The components of the PDH would include a three-story approximately 347,740 square foot data center building; a project substation; a Pacific Gas and Electric Company switching station and transmission lines; the PBGF; site access and surface parking; landscaping; stormwater controls and features; and water and sewer pipeline interconnections.

The proposed PDH site encompasses approximately 22.31 acres (APNs 095-160-001, 095-160-002, and 095-150-032) and would be located at 2232 Golf Club Road, Pittsburg, California. Thirty-six (36) of the generators would be dedicated to replacing the electricity needs of the data center and one (1) of the generators would be used to support general office loads along with building and life safety services (house generator) in the case of a loss of utility power. The PBGF is designed to operate only when electricity from Pittsburg Power Company is unavailable to the PDH. The PBGF would not be electrically interconnected to the electrical transmission grid. Rather, it would consist of one generation yard electrically interconnected solely to the PDH.

Expand All Collapse All

Key Dates

Small Power Plant Exemption

The CEC Small Power Plant Exemption (SPPE) process allows applicants proposing thermal power plants between 50 and 100 MW to obtain an exemption from the CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. The CEC can grant an exemption if it finds that the proposed facility will not create a substantial adverse impact on the environment or energy resources. These facilities were exempted from the CEC’s jurisdiction.

Original Proceeding

Submit e-Comment

Submit e-Filing

Docket Log (24-SPPE-01)

Exhibit List

Proof of Service List

Search All Power Plant Documents

Contacts

Project Manager

Ali Jahani STEPsiting@energy.ca.gov (Please enter project name in the email subject line)

(279) 226-1175

Public Participation Questions

Public Advisor publicadvisor@energy.ca.gov 916-269-9595

Media Inquiries

Media & Public Communications Office mediaoffice@energy.ca.gov 916-654-4989

Subscribe AVAIO Pittsburg Backup Generating Facility (PBGF)

Email

Please enter your email address.

Leave this field blank

Contact

California Energy Commission 715 P Street Sacramento, CA 95814

Contact Us | Directions Language Services

Careers

Come be part of creating a clean, modern and thriving California.

Learn more about Careers

Campaigns

Copyright © 2026 State of California

Suggest a change to this page

Source file: raw/web/2026-11-22 Energy Commission backup generating project AVAIO Pittsburg.md.

Suggest or correct

Know a report, dataset or law that belongs here? Found something wrong? Have a question the sources could answer? A consortium member reads every suggestion and decides. Nothing changes until a person makes the change, and the Suggestions page shows what happened to it.

About you (optional)

Your name and email stay with the team; we use the email only to reply. Your institution may appear on the contributors board.